产品应用与封装尺寸


图纸取自原厂规格书,点击可放大查看原始尺寸标注。
引脚定义与内部结构

| 引脚 | 符号 | 名称 |
|---|---|---|
| 1 | Anode / Cathode | |
| 2 | Cathode / Anode | |
| 3 | Emitter | |
| 4 | Collector |
数据来源:原厂规格书引脚图
关键参数速览
- 正向电压 VF
- ± 20mA
- 正向电流 IF
- ±60
- 集电极-发射极电压 VCEO
- 80
产品特点 Features
- AC input response
- Current transfer ratio
- (CTR: Min. 20% at IF =±1mA ,VCE =5V)
- High isolation voltage between input
- and output (Viso=5000 V rms )
- Wide Operating temperature range
- 55~110ºC
- High collector-emitter voltage VCEO=80V
- Compact dual-in-line package
- Pb free and RoHS compliant.
- UL approved (No. E214129)
- VDE approved (No. 132249)
绝对最大额定值 Absolute Maximum Ratings(TA = 25°C)
超过下表数值可能造成器件永久损坏,设计时请留余量。
| 参数 | 符号 | 额定值 | 单位 |
|---|---|---|---|
| Forward current | I | ±60 | mA |
| Peak forward current (t = | 10µs) I | 1 | A |
| Power dissipation | 100 | mW | |
| Derating factor (above 100 | ºC) | 2.9 | mW/ºC |
| Power dissipation | 150 | mW | |
| Derating factor (above 100 | ºC) | 5.8 | mW/ºC |
| Collector-Emitter voltage | V | 80 | V |
| Emitter-Collector voltage | V | 6 | V |
| Total power dissipation | P | 200 | mW |
数据来源:原厂规格书
安全与绝缘额定值(DIN EN/IEC 60747−5−5)
| 参数 | 符号 | 额定值 | 单位 |
|---|---|---|---|
| 4 PIN DIP PHOTOTRANSISTOR | EL814 | Series | |
| Operating temperature | T | -55~+110 | °C |
| Storage temperature | T | -55~+125 | °C |
| Soldering temperature | T | 260 | °C |
电气特性 Electrical Characteristics(TA = 25°C)
| 参数 | 符号 | 最小 | Typ.* | 最大 | 单位 | 条件 |
|---|---|---|---|---|---|---|
| Forward voltage | V | - | 1.2 | 1.4 | V I = | ± 20mA |
| Input capacitance | C | - | 50 | 250 | pF V = | 0, f = 1KHz |
| I | - | - | 100 | nA V | = 20V, I = 0mA | |
| current | CEO | CE | F | |||
| 80 | - | - | I = | 0.1mA | ||
| breakdown voltage | BV CEO | V C | ||||
| BV | 6 | - | - | V I = | 0.1mA | |
| breakdown voltage | ECO | E | ||||
| Transfer Characteristics | (T =25°C | unless | specified | otherwise) | ||
| 20 | - | 300 |
特性曲线(Typical Performance Curves)

相关 / 可替代型号
以上型号来自规格书与型号命名比对,参数需以各自规格书为准;下单前请与销售确认封装与脚位。
订货信息与供货形式
| 型号 | 型号2 |
|---|---|
| Part | Number |
